Manufacturing template

The DuPont rotation.

Four crews, 12-hour shifts, and the feature that sells it to the floor: a full seven days off every fourth week. Continuous 24/7 coverage with an average of 42 hours a week.

Free, no signup, no email required.

The template

One week, at a glance.

Pattern
DuPont — 4-week rotation, 12-hour shifts
Coverage
24/7 continuous, 07:00 / 19:00 starts
Fits
4 crews, 24-60 operators
People in the grid
17
Scheduled hours / week
1008h
Positions
Operator, Shift supervisor

DuPont is a FOUR-WEEK cycle. The grid below is week 1 (crews A and B working, C and D on their off-rotation); the full pattern per crew is 4 nights, 3 off, 3 days, 1 off, 3 nights, 3 off, 4 days, 7 off. Apply it four times with the crews advanced one step each week.

DuPont shift schedule — weekly shift grid, one row per staffing slot.
SlotMonTueWedThuFriSatSunShift
Crew AOperator19:0007:00+1×519:0007:00+1×519:0007:00+1×519:0007:00+1×5OffOffOff12h overnight
Crew BOperator07:0019:00×507:0019:00×507:0019:00×507:0019:00×507:0019:00×507:0019:00×507:0019:00×512h
Crew COperatorOffOffOffOff19:0007:00+1×519:0007:00+1×519:0007:00+1×512h overnight
Supervisor DayShift supervisor07:0019:0007:0019:0007:0019:0007:0019:0007:0019:0007:0019:0007:0019:0012h
Supervisor NightShift supervisor19:0007:00+119:0007:00+119:0007:00+119:0007:00+119:0007:00+119:0007:00+119:0007:00+112h overnight

One row per staffing slot; ×N means that many people on that block. Times are local to the location. +1 marks a shift that ends the following calendar day.

Use this pattern when…

  • You run a continuous process that cannot stop and you have four crews to put against it.
  • Your operators value long blocks of time off more than a predictable Monday-Friday.
  • You want a pattern with decades of industrial track record rather than something invented in a spreadsheet.

What to watch out for

  • It averages 42 hours a week, not 40. Over a 4-week cycle that is 8 hours of overtime built into the pattern — intentional, and it must be budgeted.
  • The 4-consecutive-night block is the hardest part of any 12-hour rotation. Fatigue accumulates and the fourth night is measurably the worst.
  • It only works with four full crews. Run it with three and a bit, and the coverage holes land on whoever is least able to refuse them.

From CSV to a live schedule

Three steps, no data entry.

The download is not a PDF you print and pin up. Its columns are the ones Weekwright's schedule importer reads, so the file you edit in Excel is the file you upload.

  1. 1

    Swap in your team

    Replace the placeholder names in the Employee column with your staff. Leave Day, Start, End, and Position alone — those are what the importer maps.

  2. 2

    Upload it

    Drag the file onto the schedule page. Every row is previewed with its detected columns before anything is created, so a bad cell is a warning, not a surprise.

  3. 3

    Tell the AI what changed

    “Maya is off Thursday, cover it”. The agent repairs the week against your real availability, skills, and compliance rules instead of you re-editing the grid.

Common questions

DuPont shift schedule FAQ.

Stop rebuilding the same week.

Weekwright drafts it, checks it against your rules, and lets you approve. Free for a single location.

DuPont shift schedule template (free CSV) · Weekwright